
Heat pumps
Three conditions that can change price: BUS grant ineligibility finding, structural issues with outdoor unit siting, electrical supply incapacity. Full list in the heat pump quote.
How we price
Five named conditions can change a boiler quote. We list them plainly. That's it.
The promise
Commitment 01
No "discovered issues" surcharges for things we could have foreseen in our own survey. No creative interpretations of the scope. The invoice matches the quote.
Commitment 02
The list is below. Those conditions are listed in your quote plainly, not buried in ten-point terms.
Commitment 03
No "we're already here, might as well do it" pressure conversations. If we find work outside the price, we stop, price it in writing and wait for your approval. If you decline, we leave the system safe and refund your deposit, less the call-out.
Commitment 04
No administration fees. No booking fees. No credit-card processing fees. No documentation fees. No "out of hours" fees unless the install is genuinely booked out of standard working hours.
Commitment 05
We don't inflate quotes with speculative "just-in-case" margins. If the work turns out to take less time than estimated, we don't cut the invoice. But we also don't pad it in the other direction. The price is what we actually expect the work to cost.
Always included
Things other installers routinely quote as extras. With us they are in the headline price.
Boiler (make, model, output kW confirmed)
The main unit itself, supplied and fitted by a Gas Safe registered engineer. Brand and model in writing, not “a modern efficient boiler.”
Often charged extra elsewhere
n/a
Manufacturer guarantee registration
We register the guarantee in your name on install day. Terms run from 5 to 12 years by tier, and depend on registration, the manufacturer's filter and a yearly service.
Often charged extra elsewhere
Frequently not done. Many customers discover years later their warranty was never registered
The manufacturer's own system filter
The filter the manufacturer's guarantee depends on. Catches the metal particles that damage boilers.
Often charged extra elsewhere
£150–£200
Boiler Plus compliant smart control
A smart control with automation and optimisation, or weather compensation where the boiler supports it. Fitted, set up and shown to you at handover.
Often charged extra elsewhere
£180–£250
Chemical flush, cleanse and inhibitor
A full chemical flush and inhibitor to BS 7593 before the new boiler is connected. A new boiler on a dirty system is a guarantee risk.
Often charged extra elsewhere
£250–£450
Gas Safe certificate and Building Regulations notification
Benchmark commissioning, a Gas Safe certificate and the Building Regulations notification, filed for you.
Often charged extra elsewhere
Should always be £0, but isn’t always provided
Old boiler removal and disposal
Removed, recycled and disposed of by a licensed waste carrier. No skip on your drive.
Often charged extra elsewhere
£60–£120
Standard horizontal flue up to 1 metre
Longer or vertical flues are priced as named lines in your quote before you pay anything.
Often charged extra elsewhere
Wall flue extensions £200–£500
Carbon monoxide alarm
One carbon monoxide alarm fitted with every boiler.
Often charged extra elsewhere
£30–£60
Workmanship warranty
At least 2 years on our work (3 at Advanced, 5 at Signature), on top of your statutory rights.
Often charged extra elsewhere
Often 12 months, or sold separately
Potential extras
We show you all possible extras up front, so nothing surprises you.
Asbestos survey, testing or removal
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
Access equipment above ladder height, such as scaffolding or towers
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
Gas supply work beyond the boiler, such as meter upgrades or a larger supply pipe beyond 3 metres
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
Buried or concealed pipework that needs floors, walls or ceilings opened
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
Chimney lining or capping when a back boiler is removed
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
A full powerflush where a chemical cleanse cannot recover the system
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
Replacement radiators, valves or cylinders
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
Electrical work beyond the boiler's own fused spur
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval
Making good beyond a workable standard: no plastering, tiling, decorating or flooring
Only if your photos or the install day show it is needed
Priced in writing, and only done with your approval

The fine print, in large type
If your photos show a different boiler type, position or flue from the one you chose online, the price moves by the published amount for that difference. You see it before you pay anything, and you can walk away having paid nothing.
Asbestos surveys, testing and removal are not in any price. Older homes can have it around flue routes, boiler enclosures or pipework. If we suspect it, we stop, and a licensed contractor quotes the work separately before anything goes ahead.
A standard horizontal flue up to 1 metre is in every price. A vertical flue through the roof is £395, a plume kit £85, and each metre of extension beyond the first £85.
A meter upgrade, or a larger supply pipe beyond 3 metres, is outside the price. Where one is needed we tell you before work starts, and it is priced separately.
If floors, walls or ceilings have to be opened to reach pipework, that work is outside the price. We stop, price it in writing and wait for your approval.
The same standard for every service

Three conditions that can change price: BUS grant ineligibility finding, structural issues with outdoor unit siting, electrical supply incapacity. Full list in the heat pump quote.

Two conditions: roof structural concerns found during fixing, DNO application delays for G99-grid connection. Full list in the solar quote.

The survey's moisture assessment is itself the gate; if it fails, we don't proceed. No surprise costs.

One main condition: existing sub-floor or screed incompatibility requiring remedial work.
Take the next step
Get an instant boiler price online, or book a free survey and we will put the whole number in writing before you commit to anything.